Changi Airport Terminal 3

Changi Airport Terminal 3

The design philosophy for the terminal was to create a memorable airport experience that captures the Singaporean sense of place. With over 22 million passengers visiting the airport annually, the security concerns posed by Refuse Collection Vehicles (RCVs) have raised the need for a better solid waste management solution.

 

A fully integrated and automated waste collection system was installed by STREAM. Our system is monitored remotely, without the need for onsite personnel. Furthermore, the Central Waste Handling Facility (CWHF), the point of contact for collection vehicles, is located 1.2 km away from the main terminal building. As a result, valuable spaces can be better utilised for other purposes to generate revenues, such as shop outlets and restaurants.

LOCATION

Singapore

 

YEAR
2004-2007

 

PRODUCT

Full Vacuum System

 

TOTAL PIPE LENGTH

2,000m

 

ESTIMATED WASTE PER DAY

10 metric tons